FOB Price: | USD $9000.00 - $10000.00 / Piece |
---|---|
Brand Name: | SINOLINKING |
Place of Origin: | Shandong, China |
Min.Order Quantity: | 1 Piece / Pieces |
---|---|
Payment Terms: | T/T Credit Card |
Supply Ability: | 4 Piece / Pieces per Month |
Packaging Details: | 1,LCL : Wood case or channel steel frame with iron piece |
---|---|
Port: | Qingdao |
DESCRIPTIONFeatures of High Efficiency Gold Classifier from SINOLINKING
1) The SLK-MGT series gold washing plant are designed according to your specific mining conditions and requirements.
2) Feeding system with grizzly hopper feeder, water spray pipes inside the hopper for spray waters to the soils.
3) Heavy duty clay scrubber with inside high pressure water spray pipes for breaking off hard clay. (if required)
4) Double sieve trommel screen with NSK bearings and high pressure water spray pipes on both sides for washing, screening and separating.
5) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%).
6) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc.
8) Powering system with Cummins diesel generator with all batteries, cables and wires.
9) Multiple sets of heavy duty mining type tires with towing mechanism for fully mobility and portability.
10) Gold refinery plant to make final product of gold bars.
11) Easy for installation, operation and maintaining.
12) One-Sop gold mining solutions from A to Z.
Specifications of High Efficiency Gold Classifier from SINOLINKING | |||
Model | MGT50 | MGT100 | MGT200 |
Parameters | |||
Size /mm | 7000*2000*3000 | 8300*2400*4700 | 9800*3000*5175 |
Capacity | 50-80 tph | 100-150 tph | 200-300 tph |
Power | 50 kw | 120 kw | 150 kw |
Feeder Hopper /mm | 2000*2200 | 3000*2200 | 3800*3000 |
Clay Scrubber /mm | φ1000*2000 | φ1200*3000 | φ1500*3000 |
Trommel Screen /mm | φ1200*3000 | φ1500*3500 | φ1800*4000 |
Sluice Box | 2 sets | 3 sets | 4 sets |
Water Supply /m³ | 120 m³ | 240 m³ | 370 m³ |
Wheels | 6 wheels | 10 wheels | 10 wheels |
Recovery Rate | 98% | 98% | 98% |
Detailed ImagesTechnology Details1.Feeding System
Name: Grizzly Hopper Feeder
Size (mm): 2000*2000
Grizzly screen space: 150mm or as required
Grizzly material: Railway tracks
Remark: Water spray pipes along hopper sides
Function: to feed the materials evenly to the scrubber and trommel
2.Clay Processing System
Name: Clay ScrubberSize (mm): φ1200*3000 or according to processing capacityRemark: with inside water spray pipes
Function: to break off hard clays to increase gold recovery
3.Screening System
Name: Gold Trommel Screen
Size (mm): φ1500*3500 or according to processing capacity
Remark: 2 layer trommel screen
Function: for washing, screening and separating the minerals
Water spray pipes: on both sides of the trommel
Mesh size: `12mm and 6mm or according to clients requirment
4.Coarse Gold Recovery System
Name: Vibrating Sluice + sluice boxVibrating sluice type: Hydraulic type
Size: 1m*6mSluice box carpet: Mitsubishi brand, imported from Japan
Function: for coarse gold recovery
Recovery rate: 99%
5.Fine Size Gold Recovery System
Name: Knelson type centrifugal concentrator
Processing capacity: 15tph-60tph dry solids
Quantity: 2-4 pcs
Remark: Fully continuous type
Function: for fine size dust gold recovery (-6mm)
Recovery Rate: 99%
6.Water Supplying System
Name: Submersible slurry pump
Quantity: 1-3 pcs
Water flow: 120-400m³ per hour
Funciton: for supplying water to the wash plant
7.Powering system
Name: Cummins diesel Generator
Power: 100Kw-350Kw
Brand: Cummins, Weichai, or as required
Function: supplying power to all the systems
8. Gold Shaker Table
Model: 6SPower: 2.2KwFunction: to further process the concentrates from the sluice and/or concentrators
9. Mercury Amalgamator
Type: V-shapedWorking mode: amlagamator + distiller retortFunction: With the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentatorsRecovery rate: 100%
10. Gold Smelting Furnace
Capacity: 10-15kg per batchMoulds: 100g; 200g; 500g; 1000gFunction: to smelting the gold sand and make into final product of gold bars
Gold Mixture
Pure gold sand
Gold bars after smelting
Our ServicePre-Sales Service
* Receiving clients inquiry
* Studying clients mining conditions
* Introducing our machinery
* Propose the most suitable solution
After-Sales Service
* Design outlet with 3D drawing photo
* Producing according to the design
* Inspection and testing before delivery
* Engineers installation and training service overseas
Packing & Delivery
Packaging of High Efficiency Gold Classifier from SINOLINKING | |
Container type | 20'GP, 40'HQ |
Container qty | 1-6 pcs |
Delivery time | 10-30 days |
Price items | EXW, FOB, CIF |
Spare parts | Free spare parts avaiable |
1: How long takes for installation ? -Normally within 7-10 days if everything is ready.2: What are the oversea service charge ? -Airline tickets, visa fees and salary |
Our FactoryWhy Chose Us?
1. 15 Years factory
2. Exported to 35 countries
3. Over 300 projects worldwide
4. All customized design
5. Ensure highest recovery rate of gold
6. Short delivery time
7. Easy to install, operate and maintain
8. Super durable heavy duty machine
9. One-stop mining solution
10. Turn-key operations
FAQ
1. Are you factory?
Yes, established in 2002, over 15 years factory
2. How big are you?
In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers
3. What equipment do you build?
Specialized in alluvial/placer gold/diamond mining equipment
4. Whats the capacity of the gold/diamond mining equipment
from 5TPH to 450TPH
5. What brand engine/diesel generator do you use?
Cummins, Weichai, Yuchai, etc, or as required
Contact UsLillian
One-Stop Gold Mining Solutionswith Turn-Key OperationsWhatsapp: 0086 135 7328 3285Wechat: 0086 135 7328 3285Skype: Lillian.trinityEmail: Lillian at sinolinking.com
Related Products200TPH Gold Wash Plant
91.8% Response Rate
100TPH Gold Wash Plant
91.8% Response Rate
100TPH Diamond Wash Plant
91.8% Response Rate
Enter between 20 to 4,000 characters.
Thank you for your enquiry and you will be contacted soon.